Scope

OblinCEA completed a potentially difficult and technical installation for a well-known drinks manufacturer in Chachoengsao, Thailand. 

OblinCEA provided Heavy Transport, Heavy Lift and the installation of several parts of distillation columns, evaporators, separators, and fans.

28-Tonne Evaporator Chamber Lowered into the Facility

All parts were discharged through the night at Laem Chabang Port and loaded onto several flatbed trailers. Due to its size and weight, the Evaporator Chamber section was loaded onto a multi-axle hydraulic trailer. The parts were then transported under escort and unloaded at the factory’s lay-down area. After a site inspection, two mobile cranes were moved into position and readied for the lifts.

The Evaporator Chamber was lifted by both cranes until the chamber was vertical then the smaller crane was unhooked while the larger 500-tonne crane continued the lift into the facility. OblinCEA teams stationed within the building ensured the safe lowering of the evaporator through the floors of the factory.

The 16-metre distillation chamber was installed using the same lift technique as the Evaporator, OblinCEA teams once again were located on each floor to ensure it was lowered safely and correctly aligned to the previously installed Evaporator. Smaller parts were unloaded and assembled at the installation site and lifted into the facility. All the project was completed in three days within the given timeframe and budget.

CEA Teams Guide the Separator through Each Floor

Project Details

Location
Chachoengsao, Thailand

Duration
Three Days

Total Weight
47 Tonne

Project Photos

Oblin Group Partners
Oblin Green Hyrogen/Ammonia Partner Morocco
Oblin Hydro Electric Partner UK
Oblin Waste To Energy Partner Australia
OblinEngine
Oblin Energy Storage Partner UK
Oblin Solar Partner
Oblin IT Project Management Partner UK
Oblin Asian Partne Myanmar,Thailand and Cambodia
Oblin Renewables Partner Germany
Oblin O&M Partner Australia